 | Under Construction |
 |
Beijing Mass Transit Railway Operation Corporation Limited Běijīng Subway Line 19 |
|
|
Name |
Name | 新宫车辆段 |
English | Xīngōng Rolling Stock Depot |
Korean | 신궁 차량기지 |
Japanese | シンゴンしゃりょうだん 新宮車両段 |
| (신궁차량단) |
|
Address | |
Open |
12/31/2021 |
운영 | Beijing Mass Transit Railway Operation Corporation Limited |
소유 |
Map |
DMS | 39° 49′ 4.94″ N, 116° 21′ 13.26″ E  | Decimal | 39.818039266, 116.353683886  |
WKT | Point(116.35368389 39.81803927)  |
UTM | 50S 444684 4407761  |
Map | |
|